A Malaysian engineering PhD scholar asked us to check a questionnaire six weeks before fieldwork. Our mentors found that the main dataset had never been agreed in writing, the pilot was planned before ethics approval, and the sample would miss most of the engineers who do the work. This is how we fixed it over five sessions.

PhD Research Lab InsightsCase note, reviewed by a subject specialist
Posted
28 November 2026
Last checked
28 November 2026
Reading time
8 min
Sources
11

This case is drawn from our mentoring sessions. To protect confidentiality, names, dates, the institution and other identifying details have been changed, and the scholar agreed to us sharing the approach.

How we handled it, session by session

  1. 01
    Diagnostic review (6 August 2026, 10:00 MYT)

    Dr Harish (a pseudonym), an electrical engineering mentor with field-monitoring experience, and a methodology specialist reviewed the proposal, questionnaire and sensor plan, then ran a one-hour call using our five-stage check.

    Subject mentor and methodology specialist
  2. 02
    Securing the data (11 August 2026)

    We paused the questionnaire and drafted a written data access request to the solar operator, sent on university letterhead, plus a fallback dataset.

    Scholar, supervisor and mentor
  3. 03
    Ethics and personal data (18 August 2026)

    We moved the pilot to after ethics approval and agreed with the operator that technician names would be removed before release.

    Mentor
  4. 04
    Designing the pilot (25 August 2026)

    We rebuilt the pilot so it ran on site into the wet season, with calibration drift, humidity, rainfall and cleaning events logged.

    Mentor
  5. 05
    Reaching the right engineers (1 September 2026)

    We set a target sample, added a Bahasa Malaysia version and four recruitment channels, with weekly tracking by registration grade and region.

    Methodology specialist
  6. 06
    Making every figure traceable (8 September 2026)

    We set up raw and processed folders, a decision log, version control and a measurement uncertainty budget.

    Mentor

What we checked

  • Is every dataset the thesis depends on agreed in writing, with a fallback?
  • Does any step, including a pilot, involve people before ethics approval?
  • Will the instruments face the same conditions in the pilot as in the main campaign?
  • Does the sample reflect the people who actually do the work?
  • Can each thesis figure be traced back to unchanged raw data?

What the scholar left with

  • A written data access request ready for the supervisor to send
  • An ethics application drafted before any participant contact
  • A wet-season pilot plan with a calibration and maintenance log
  • A bilingual questionnaire, recruitment plan and weekly tracker
  • A data management structure and uncertainty budget

The scholar and what he brought to us

Aiman (a pseudonym), a second-year PhD candidate in electrical engineering at a Malaysian public university, booked a mentoring session with the PhD Research Lab on 4 August 2026, about six weeks before his planned fieldwork. His study looked at how soiling and humidity reduce the output of photovoltaic (PV) systems on the east coast of Peninsular Malaysia, and how operations and maintenance (O&M) teams decide when to clean panels.

His question was narrow: “Can you check that my questionnaire is ready to send?” We looked at the whole data plan instead, because problems in an engineering PhD usually start one or two stages before the point where they surface.

What our diagnostic review found

StageWhat we foundWhy it mattered
ProposalGeneration and cleaning-log data were promised by a solar operator in an informal conversation with a site manager.Both main research questions depended on this data, and there was no fallback.
ApprovalsThe scholar assumed an engineering study did not need ethics review and planned to pilot the questionnaire with colleagues first.At the University of Malaya, for example, no participant may be approached, even for a pilot, before approval (UMREC-NM, n.d.).
PilotSensors were calibrated only in the laboratory, with no plan to log humidity, rainfall or cleaning events.East-coast sites are hot, very humid and wet-dusty; soiling losses there are large and variable (Islam et al., 2022).
Main collectionAn English-only questionnaire would go out through one professional body’s mailing list.It would reach mostly senior Professional Engineers and miss the graduate engineers who do most O&M work.
Data managementRaw logger files were renamed and overwritten in one shared folder.Examiners could not trace figures back to raw data or judge measurement error.

Securing the data before anything else

We drafted a one-page data access request listing the exact variables (inverter output, irradiance, module temperature, cleaning dates), period, resolution, format, how site names would be anonymised and what the operator could review before publication. The supervisor sent it on university letterhead, because operators route such requests through legal and compliance teams rather than site staff.

We also agreed a fallback that could answer a narrower version of the question: the scholar’s own test rig plus published Malaysian soiling studies. One 12-month study of a 2.5 MW PV site in Terengganu reported an average soiling loss of 26.22%, ranging from 4.86% to 58.67% (Jamil et al., 2020, as reported by Islam et al., 2022).

Ethics approval and personal data

The O&M survey and interviews were research with human participants. Ethics review in Malaysia runs mainly through university committees, guided by the Malaysian Code of Responsible Conduct in Research (National Science Council, 2020), so the scholar checked his own university’s rules and moved the pilot to after approval.

The operator’s cleaning logs contained technicians’ names. The Personal Data Protection Act 2010 governs personal data processed in commercial transactions, so the operator was bound by it (Lex Mundi, n.d.), and the 2024 amendments, in force in phases during 2025, added data protection officers, breach notification and data portability (ASEAN Briefing, 2025). We advised asking the operator to remove names before release. Because one co-supervisor was overseas, we also flagged the 2025 cross-border transfer guidelines and asked the scholar to agree where the data would be stored (Mayer Brown, 2025).

A pilot for humid, wet-dust conditions

The site’s relative humidity is around 80–90% in the rainy season and the dust that settles on panels tends to be wet (Islam et al., 2022); haze episodes have also affected solar generation in the region (Maghami et al., 2015). The new pilot ran for two weeks on site into the start of the monsoon period, with calibration checks before and after, ambient temperature, humidity and rainfall logged alongside the PV variables, a manual log of every cleaning event, and an end-of-pilot check of enclosure seals for condensation.

Reaching the engineers who do the work

As of 31 July 2025, the Board of Engineers Malaysia register held 219,268 Graduate Engineers but only 18,130 Professional Engineers (Wan Harun, 2025). A sample drawn from senior contacts would describe a small, unrepresentative group. We set a target sample size in advance, added a back-translated Bahasa Malaysia version, recruited through O&M contractors, project sites, the Institution of Engineers Malaysia and alumni networks, and tracked responses weekly by registration grade and region.

Making every figure traceable

We set up a read-only raw folder, a processed folder, a decision log for every cleaning or exclusion step and version-controlled scripts, aligned with the FAIR principles (Wilkinson et al., 2016), and drafted a measurement uncertainty budget for each sensor following the GUM (JCGM, 2008).

What changed

AreaBeforeAfter
Partner dataVerbal promise from a site managerWritten request with variables, period and anonymisation; fallback agreed
Ethics and PDPANo ethics application; pilot with colleaguesEthics application before any contact; names removed by operator; storage agreed
PilotLaboratory calibration onlyOn-site wet-season pilot with drift, weather and cleaning events logged
SampleEnglish-only, one mailing listBahasa Malaysia and English; four channels; weekly tracking
RecordsOverwritten filesRaw and processed split, decision log, version control, uncertainty budget

For the full stage-by-stage guide behind these steps, read Engineering PhD Data Collection in Malaysia.

What this case taught us

  • The question scholars bring is rarely the real problem. This one was about a questionnaire; the bigger risk was a dataset that did not yet exist on paper.
  • Engineering studies involve people more often than expected. Surveys, interviews and logs with names bring in ethics review and data protection.
  • A laboratory calibration is not a field calibration. In humid, wet-dust conditions the pilot must include the weather the campaign will face.
  • Who you can reach decides what you can claim. A sample built from senior contacts over-represents Professional Engineers.

What to do now

  • List every dataset your thesis depends on and check that each is agreed in writing.
  • Ask your ethics committee whether your pilot needs approval before you contact anyone.
  • Plan your pilot in the same season and site conditions as your main campaign.
  • Compare your sampling frame with the real make-up of the profession you are studying.
Your next step

Want us to review your data collection plan?

  1. 1Send your plan, instruments and timeline
  2. 2A subject mentor runs the same stage-by-stage check
  3. 3You get a written risk review and next steps
One-to-one mentoring

Questions scholars ask

Does an engineering PhD survey need ethics approval in Malaysia?

Usually yes, if it involves people. At the University of Malaya, for example, participants may not be approached, even for a pilot, before the non-medical ethics committee approves the study (UMREC-NM, n.d.). Check your own university’s rules.

Does the PDPA apply to data I receive from a company?

The PDPA governs personal data processed in commercial transactions, so a company partner is bound by it (Lex Mundi, n.d.). Ask the partner to remove identifying details before release and confirm your university’s position.

Will PhD Research Lab collect or write my data for me?

No. We mentor you on planning, design and methods; the data collection, analysis and writing remain your own.

Sources

  1. ASEAN Briefing. (2025). Malaysia tightens data protection from June 2025. https://www.aseanbriefing.com/news/malaysia-tightens-data-protection-from-june-2025/
  2. Islam, S. Z., Izzati, N. S., Abdullah, M. N., et al. (2022). Automated water recycle (AWR) method for dust removal from rooftop photovoltaic (PV) at Johor, Malaysia. SN Applied Sciences, 4, 321. https://doi.org/10.1007/s42452-022-05205-7
  3. Jamil, W. J., Rahman, H. A., Shaari, S., & Desa, M. K. M. (2020). Modeling of soiling derating factor in determining photovoltaic outputs. IEEE Journal of Photovoltaics, 10(5), 1417–1423. https://doi.org/10.1109/JPHOTOV.2020.3003815
  4. Joint Committee for Guides in Metrology. (2008). Evaluation of measurement data – Guide to the expression of uncertainty in measurement (JCGM 100:2008). BIPM. https://doi.org/10.59161/JCGM100-2008E
  5. Lex Mundi. (n.d.). Global data privacy guide: Malaysia. https://www.lexmundi.com/guides/data-privacy-guide/jurisdictions/asia-pacific/malaysia
  6. Maghami, M. R., Hizam, H., Gomes, C., Hajighorbani, S., & Rezaei, N. (2015). Evaluation of the 2013 Southeast Asian haze on solar generation performance. PLOS ONE, 10(8), e0135118. https://doi.org/10.1371/journal.pone.0135118
  7. Mayer Brown. (2025, July 25). From legislative reform to practical guidance: Key amendments to Malaysia’s PDPA and the launch of cross-border transfer guidelines. https://www.mayerbrown.com/en/insights/publications/2025/07/from-legislative-reform-to-practical-guidance-key-amendments-to-malaysias-pdpa-and-the-launch-of-cross-border-transfer-guidelines
  8. National Science Council. (2020). The Malaysian Code of Responsible Conduct in Research (2nd ed.). Academy of Sciences Malaysia. https://nmrr.gov.my/documents/86c1c803-4560-48dd-ba94-98a31c3097f1/download
  9. University of Malaya Research Ethics Committee – Non-Medical. (n.d.). UMREC-NM. University of Malaya. https://umresearch.um.edu.my/?p=366
  10. Wan Harun, W. S. (2025, August 4). Why Malaysia’s ‘Ir.’ is stagnating? UMPSA News. https://news.umpsa.edu.my/experts/why-malaysias-ir-stagnating
  11. Wilkinson, M. D., Dumontier, M., Aalbersberg, I. J., et al. (2016). The FAIR Guiding Principles for scientific data management and stewardship. Scientific Data, 3, 160018. https://doi.org/10.1038/sdata.2016.18
Inside the Lab: How We Reworked an Engineering PhD Data Collection Plan Before Fieldwork (Malaysia)PhD Research Lab Insights