Renewable energy in India: techno-economic and socio-economic research gaps in cost, finance and rural access

India passed half of its installed power capacity from non-fossil sources in 2025 (Ministry of New and Renewable Energy, 2025). Studies that price renewable systems are now plentiful, but few connect costs to finance conditions, load growth and what households and enterprises actually gain (International Energy Agency, 2024a; Aklin et al., 2017).

PhD Research Lab InsightsEditorial team, reviewed by a subject specialist
Posted
18 June 2021
Last checked
8 October 2026
Reading time
11 min
Sources
10
Research proposal support
The gap

Techno-economic assessments of renewable systems in South Asia usually size one system for one site with simulation software and report a levelised cost of electricity under assumed finance and demand (Raman et al., 2022; Ali et al., 2021). We know much less about how the cost of capital and distribution company risk change those results (International Energy Agency, 2024a; International Energy Agency, 2024b), how demand grows after connection, and whether access produces the income, savings and study gains that projects promise (Aklin et al., 2017).

Data gap (site, demand and finance inputs)Methods gap (linking techno-economic and socio-economic assessment)Evidence gap (causal socio-economic impacts)Policy gap (finance and off-taker risk)

What we know

  • India reported 253.96 GW of renewable capacity and 262.74 GW of non-fossil capacity (51.5% of 509.64 GW installed) at 30 November 2025, with a record 44.51 GW of renewables added in January to November 2025 (Ministry of New and Renewable Energy, 2025).
  • India's updated NDC commits to about 50% of cumulative installed power capacity from non-fossil sources and a 45% cut in the emissions intensity of GDP from 2005 by 2030, with net zero by 2070 (Government of India, 2022).
  • Globally, 91% of newly commissioned utility-scale renewable capacity in 2024 produced power at a lower levelised cost than the cheapest new fossil alternative (International Renewable Energy Agency, 2025).
  • In emerging and developing economies the cost of capital for utility-scale solar is well over twice that in advanced economies, and financing can account for around half or more of the levelised cost (International Energy Agency, 2024a).
  • Simulation studies with HOMER Pro size hybrid microgrids for villages in India and Pakistan and show that grid connection and load assumptions change the cost per kWh substantially (Raman et al., 2022; Ali et al., 2021).
  • A randomised field experiment with solar microgrids in Uttar Pradesh reduced private kerosene spending but found no systematic evidence of changes in savings, business creation or time spent working or studying (Aklin et al., 2017).

What we do not know yet

Research questions a PhD could ask

  1. How sensitive is the levelised cost of a village solar-battery microgrid in a chosen Indian state to the discount rate, compared with capital cost and load factor?
  2. Does sizing a rural microgrid for projected load growth lower the lifetime cost per kWh compared with sizing for current load?
  3. Do enterprises connected to a mini-grid with productive-use support increase income more than those connected without it?
  4. How do payment-security mechanisms for distribution companies affect the financing cost of renewable projects?
  5. What are rural households' willingness to pay for reliable daytime supply, and how does it compare with tariff and subsidy levels?
Methods that could close the gap
ApproachWhy it fits
Techno-economic simulationSize systems with HOMER Pro or similar tools, report levelised cost and net present cost, and test sensitivity to finance and demand assumptions (Raman et al., 2022; Ali et al., 2021).
Finance-adjusted cost analysisUse observed rather than assumed costs of capital and compare scenarios (International Energy Agency, 2024a).
Randomised or quasi-experimental impact evaluationMeasure household and enterprise outcomes against a credible comparison group (Aklin et al., 2017).
Stated-preference surveysEstimate willingness to pay with contingent valuation or choice experiments (Tadele & Kalyebara, 2023).
Policy and document analysisTrace how national targets and payment-security schemes reach projects (Government of India, 2022; International Energy Agency, 2024b).
Gap typeIndustry and research both working on it

The problem

India is adding renewable capacity at record pace (Ministry of New and Renewable Energy, 2025), but decisions about where and how to build still rest on cost estimates that rarely reflect finance risk, load growth or social returns (International Energy Agency, 2024a; Raman et al., 2022).

Why it happens

High financing costs in emerging economies and the weak finances of some distribution companies raise the cost of capital (International Energy Agency, 2024a; International Energy Agency, 2024b); site studies also tend to assume flat demand and to stop at cost per kWh rather than measuring benefits (Aklin et al., 2017).

Where it is felt most

The problem is felt most in rural and weak-grid areas and in states whose distribution companies are under financial stress; globally, progress on energy access remains off track, especially in sub-Saharan Africa (International Energy Agency, 2024b; IEA et al., 2025).

How big is the problem

What studies say, and at what level of evidence
LevelWhat it shows
Trials or field studiesA randomised experiment in 81 habitations in Barabanki, Uttar Pradesh, found that basic solar microgrid service cut kerosene spending but did not change savings, business creation or study time within the study period (Aklin et al., 2017).
Lab and simulation studiesHOMER Pro studies estimate about US$0.14 per kWh for a growth-aware rural microgrid in India (Raman et al., 2022) and show grid-connected hybrids costing roughly half as much per kWh as off-grid systems in a Pakistani village (Ali et al., 2021).
Industry and policy reportsIRENA reports falling installed costs and broad cost advantage for new renewables (International Renewable Energy Agency, 2025); the IEA shows how finance costs and off-taker risk shape that advantage in emerging economies and India (International Energy Agency, 2024a; International Energy Agency, 2024b).
Official statisticsMNRE data show the capacity build-out (Ministry of New and Renewable Energy, 2025); the SDG7 tracking report shows access targets off track globally (IEA et al., 2025).
Observational studiesWillingness-to-pay surveys exist for some markets, such as the UAE (Tadele & Kalyebara, 2023), but comparable Indian rural evidence is thin.
What is missingStudies that join a techno-economic model to observed finance terms, multi-year demand data and measured socio-economic outcomes in the same setting.

Who should take this on

Scholar profile

  • An energy engineer who can collect site load and resource data and run system simulations.
  • An economist interested in project finance, discount rates and public policy for power markets.
  • A development researcher with field access to villages or enterprises served by mini-grids or rooftop solar.
  • A professional from a utility, developer or state nodal agency with access to project cost records.

Subjects and PhD specialisations

  • Energy economics
  • Development economics
  • Electrical and power systems engineering
  • Environmental and resource economics
  • Public policy (energy and climate)
  • Finance (project finance)

Countries where the problem is greatest

Scope for future research

  1. Finance-adjusted levelised cost: how discount rates and off-taker risk change project rankings (International Energy Agency, 2024a; International Energy Agency, 2024b).
  2. Demand growth and productive use after electrification (Raman et al., 2022; Aklin et al., 2017).
  3. From capacity to generation: storage, curtailment and system cost as capacity shares rise (Ministry of New and Renewable Energy, 2025).
  4. Willingness to pay and tariff design for reliable rural supply (Tadele & Kalyebara, 2023).
  5. Joint techno-economic and socio-economic evaluation of mini-grids and rooftop schemes (Ali et al., 2021; Aklin et al., 2017).

How a doctoral project could address it

  1. Choose the decision

    State the decision your assessment informs (a site, a scheme, a tariff or a finance instrument) and the stakeholder who makes it.

  2. Gather real inputs

    Collect measured load, resource and cost data and observed finance terms; do not rely only on default software values (International Energy Agency, 2024a).

  3. Model transparently

    Report levelised cost, net present cost and sensitivity to discount rate, demand growth and component prices (Raman et al., 2022; Ali et al., 2021).

  4. Measure benefits

    Use a comparison group or a phased roll-out to measure household and enterprise outcomes (Aklin et al., 2017).

  5. Add stated preferences

    Survey willingness to pay to link costs to what users value (Tadele & Kalyebara, 2023).

  6. Work with partners and ethics

    Partner with a developer, utility or state agency, agree data-sharing terms and obtain ethics approval for household surveys.

Why it is worth solving

Better estimates of cost under realistic finance and demand would help developers, lenders and state agencies direct money to projects that last, and help India meet its NDC commitments at lower cost (Government of India, 2022; International Energy Agency, 2024a).

For households and small firms, evidence on which supply levels and support services create real gains would make access programmes more than a connection count (Aklin et al., 2017; IEA et al., 2025).

What has changed since 2021

At 30 November 2025, MNRE reported 253.96 GW of renewable capacity, including 132.85 GW of solar and 53.99 GW of wind, and non-fossil sources made up 51.5% of the 509.64 GW installed (Ministry of New and Renewable Energy, 2025). India's updated NDC of August 2022 set the current national commitments (Government of India, 2022).

How the main claims of the 2021 page have changed
Common claimCurrent positionSource
175 GW of renewables by 2022Superseded: about 50% non-fossil installed capacity by 2030, 45% lower emissions intensity of GDP than 2005, net zero by 2070(Government of India, 2022)
About 36.9 GW of solar by end 2020132.85 GW of solar at 30 November 2025(Ministry of New and Renewable Energy, 2025)
Solar cost-effectiveness is an open questionNew utility-scale renewables are usually cheaper than new fossil plants; finance costs are now the bigger question in emerging economies(International Renewable Energy Agency, 2025; International Energy Agency, 2024a)
Fossil fuels cause one third of emissionsIncorrect; removedNot repeated

One caution matters for research design. A capacity share is not a generation share: solar and wind plants run for fewer hours than coal plants, so reaching half of installed capacity does not mean half of electricity generated. Use generation data from the Central Electricity Authority when your question is about energy supplied.

Techno-economic and socio-economic assessment: what each answers

A techno-economic assessment asks whether a system works and what it costs. Typical outputs are the levelised cost of electricity (lifetime cost divided by lifetime energy, both discounted), net present cost and payback. Tools such as HOMER Pro and RETScreen are widely used to size hybrid systems (Raman et al., 2022; Ali et al., 2021).

A socio-economic assessment asks who benefits and how: spending on fuels, income, enterprise, time use, education and health. These outcomes need field data and, ideally, a comparison group (Aklin et al., 2017). The gap lies between the two: most studies do one and assume the other.

An illustrative example and common mistakes

Illustrative and hypothetical: two studies model the same village microgrid. One assumes a 6% discount rate and constant demand; the other uses a discount rate close to what local lenders charge and lets demand grow as households buy appliances. Because financing can be around half of the levelised cost in emerging economies (International Energy Agency, 2024a), and because growth-aware sizing changes the optimal system (Raman et al., 2022), the two studies can reach different conclusions about viability from identical equipment prices.

What to do now

  • Download the latest MNRE capacity release and CEA generation data for your state before writing your problem statement.
  • Read Aklin et al. (2017) to see how a socio-economic impact study is designed and why null results matter.
  • Decide which finance assumptions you can justify with observed data (International Energy Agency, 2024a).
  • Identify a developer, utility or agency partner who can share site and cost records.
Your next step

Could this gap become your thesis?

  1. 1Read the evidence and the open questions
  2. 2Talk to a mentor about fit, data and method
  3. 3Build a defensible proposal
See proposal support

Questions scholars ask

What is the difference between techno-economic and socio-economic assessment?

Techno-economic assessment estimates performance and cost; socio-economic assessment measures effects on people and the economy. Strong projects combine them (Raman et al., 2022; Aklin et al., 2017).

Has India reached its 2030 non-fossil target?

MNRE reported a 51.5% non-fossil share of installed capacity in November 2025 (Ministry of New and Renewable Energy, 2025), above the NDC's about 50% capacity goal (Government of India, 2022). Capacity is not generation, so check CEA data for energy shares.

Why does the cost of capital matter so much?

Renewable projects are capital-intensive, so interest and return requirements make up a large part of lifetime cost, around half or more for utility-scale solar in emerging economies (International Energy Agency, 2024a).

Is HOMER enough for a PhD?

A simulation alone is rarely enough. Add real input data, sensitivity analysis and a question about finance, demand or impact (Raman et al., 2022; Ali et al., 2021).

Sources

  1. Aklin, M., Bayer, P., Harish, S. P., & Urpelainen, J. (2017). Does basic energy access generate socioeconomic benefits? A field experiment with off-grid solar power in India. Science Advances, 3(5), Article e1602153. https://doi.org/10.1126/sciadv.1602153
  2. Ali, F., Ahmar, M., Jiang, Y., & AlAhmad, M. (2021). A techno-economic assessment of hybrid energy systems in rural Pakistan. Energy, 215, Article 119103. https://doi.org/10.1016/j.energy.2020.119103
  3. Government of India. (2022). India's updated first nationally determined contribution under Paris Agreement (2021-2030). UNFCCC. https://unfccc.int/sites/default/files/NDC/2022-08/India%20Updated%20First%20Nationally%20Determined%20Contrib.pdf
  4. IEA, IRENA, UNSD, World Bank, & WHO. (2025). Tracking SDG7: The energy progress report, 2025. https://www.iea.org/reports/tracking-sdg7-the-energy-progress-report-2025
  5. International Energy Agency. (2024a). Reducing the cost of capital: Strategies to unlock clean energy investment in emerging and developing economies. IEA. https://www.iea.org/reports/reducing-the-cost-of-capital/executive-summary
  6. International Energy Agency. (2024b). India case study (Cost of Capital Observatory). IEA. https://www.iea.org/reports/india-case-study
  7. International Renewable Energy Agency. (2025). Renewable power generation costs in 2024. IRENA. https://www.irena.org/Publications/2025/Jun/Renewable-Power-Generation-Costs-in-2024
  8. Ministry of New and Renewable Energy. (2025, December 29). 2025 marks highest-ever renewable energy expansion in India's energy transition journey [Press release]. Press Information Bureau, Government of India. https://nghm.mnre.gov.in/admin/uploads/176794038987418Press%20Release_Renewable%20Energy%20Capacity%20in%202025.pdf
  9. Raman, M., Meena, P., Champa, V., Prema, V., & Mishra, P. R. (2022). Techno-economic assessment of microgrid in rural India considering incremental load growth over years. AIMS Energy, 10(4), 900-921. https://doi.org/10.3934/energy.2022041
  10. Tadele, H., & Kalyebara, B. (2023). Willingness to pay for green energy sources in the United Arab Emirates (UAE). International Journal of Renewable Energy Development, 12(3), 528-540. https://doi.org/10.14710/ijred.2023.50575

How to cite this page

Choose your referencing style, then copy.

PhD Research Lab Insights. (2021, June 18). Renewable energy in India: techno-economic and socio-economic research gaps in cost, finance and rural access. PhD Research Lab. https://www.phdassistance.com/blog/techno-economic-socio-economic-scope-for-phd-students/

PhD Research Lab Insights. “Renewable Energy in India: Techno-economic and Socio-economic Research Gaps in Cost, Finance and Rural Access.” PhD Research Lab, 18 June 2021, www.phdassistance.com/blog/techno-economic-socio-economic-scope-for-phd-students. Accessed [access date].

PhD Research Lab Insights (2021) Renewable energy in India: techno-economic and socio-economic research gaps in cost, finance and rural access. PhD Research Lab. Available at: https://www.phdassistance.com/blog/techno-economic-socio-economic-scope-for-phd-students/ (Accessed: [access date]).

PhD Research Lab Insights. “Renewable Energy in India: Techno-economic and Socio-economic Research Gaps in Cost, Finance and Rural Access.” PhD Research Lab. June 18, 2021. https://www.phdassistance.com/blog/techno-economic-socio-economic-scope-for-phd-students.

PhD Research Lab Insights, ‘Renewable Energy in India: Techno-economic and Socio-economic Research Gaps in Cost, Finance and Rural Access’ (PhD Research Lab, 18 June 2021) <https://www.phdassistance.com/blog/techno-economic-socio-economic-scope-for-phd-students> accessed [access date].

PhD Research Lab Insights. Renewable energy in India: techno-economic and socio-economic research gaps in cost, finance and rural access [Internet]. PhD Research Lab; 2021 Jun 18 [cited [access date]]. Available from: https://www.phdassistance.com/blog/techno-economic-socio-economic-scope-for-phd-students/

PhD Research Lab Insights, “Renewable energy in India: techno-economic and socio-economic research gaps in cost, finance and rural access,” PhD Research Lab, June 18, 2021. [Online]. Available: https://www.phdassistance.com/blog/techno-economic-socio-economic-scope-for-phd-students. [Accessed: [access date]].

@online{techno_economic_socio_economic_scope_for_phd_students_2021,
  author = {{PhD Research Lab Insights}},
  title = {{Renewable energy in India: techno-economic and socio-economic research gaps in cost, finance and rural access}},
  organization = {PhD Research Lab},
  date = {2021-06-18},
  url = {https://www.phdassistance.com/blog/techno-economic-socio-economic-scope-for-phd-students},
  urldate = {[access date]}
}

  • Renewable energy
  • India
  • Techno-economic assessment
  • Energy access
  • Energy finance
Renewable energy in India: techno-economic and socio-economic research gaps in cost, finanResearch gap · Economics & finance
Proposal support